Testing of Transformers: Procedures, Importance, and Standards

Testing of Power Transformers

Testing is a critical step in ensuring the reliability, safety, and efficiency of transformers. Whether during manufacturing, commissioning, or routine maintenance, transformer testing verifies that the equipment meets operational standards and can handle various loads without failure. In this blog, we will explore different types of tests conducted on transformers, including routine, type, and on-site tests, detailing their procedures, importance, and the standards they adhere to.

1. Type Tests

Type tests are conducted on a prototype transformer to validate its design and ensure it meets specified standards before mass production. These tests verify the transformer's performance under different operating conditions.

Key Type Tests:

1.1 Measurement of Winding Resistance

  • Purpose: To verify the integrity of the windings and detect issues such as loose connections or damaged conductors.

  • Procedure: A DC current is injected into the windings, and the voltage drop is measured. The resistance is then calculated using Ohm's law.

  • Standards: Performed according to IEC 60076-1.

1.2 Measurement of Voltage Ratio and Vector Relationship

  • Purpose: To confirm that the transformer's primary and secondary windings are correctly configured and meet the specified voltage ratio.

  • Procedure: Apply voltage to the primary winding and measure the output voltage at the secondary. Calculate the ratio and verify its accuracy.

1.3 Impedance Voltage, Short-Circuit Impedance, and Load Loss Measurement

  • Purpose: To determine the voltage drop, impedance, and losses when the transformer is under load, providing insights into its efficiency.

  • Procedure: Apply a short circuit to the secondary winding, then apply a reduced voltage to the primary to create a specified current. Measure the power loss and voltage drop.

1.4 No-Load Loss and Current Measurement

  • Purpose: To evaluate the core losses of the transformer under normal operating conditions without any load connected.

  • Procedure: Apply the rated voltage to the primary winding, leaving the secondary open. Measure the power loss, which primarily consists of core losses.

1.5 Temperature-Rise Test

  • Purpose: To determine the transformer's ability to dissipate heat and operate safely within its thermal limits.

  • Procedure: Operate the transformer at its rated load for a specified period. Measure the temperature of the windings and oil to ensure they do not exceed safe limits.

2. Routine Tests

Routine tests are conducted on every transformer during manufacturing to ensure that each unit meets the required operational standards. These tests ensure quality and reliability before the transformer is deployed.

Key Routine Tests:

2.1 Insulation Resistance Test

  • Purpose: To check the insulation's quality and ensure there is no leakage current between windings and ground.

  • Procedure: Apply a high DC voltage across the windings and measure the resistance using an insulation resistance tester (megger).

2.2 Measurement of Winding Resistance

  • Purpose: To detect any abnormalities in the windings, such as loose connections or faulty conductors.

  • Procedure: Similar to the type test, a DC current is applied, and the voltage drop is measured to calculate resistance.

2.3 Voltage Ratio Test

  • Purpose: To verify the correct turn ratio between the primary and secondary windings.

  • Procedure: Apply a known voltage to the primary and measure the output on the secondary to confirm the ratio is within specified limits.

2.4 Dielectric Tests

  • Separate Source AC Withstand Test: Applies a high AC voltage to check the insulation strength of the windings.

  • Induced Overvoltage Test: Subjects the transformer to an overvoltage condition to ensure it can handle voltage surges without insulation breakdown.

3. On-Site Tests

On-site tests are performed after the transformer is installed to ensure it is properly set up and functioning before it is put into operation.

Key On-Site Tests:

3.1 Insulation Oil Testing (BDV and DGA)

  • Breakdown Voltage (BDV) Test: Measures the dielectric strength of the insulating oil to ensure it can withstand high voltages.

  • Dissolved Gas Analysis (DGA): Identifies gases dissolved in the oil, indicating potential issues such as overheating or insulation breakdown.

3.2 Magnetizing Current Test

  • Purpose: To identify any issues with the transformer's core or winding assembly.

  • Procedure: Apply a voltage to the primary winding and measure the magnetizing current, comparing it with standard values.

3.3 Ratio Test

  • Purpose: To confirm the transformer's turns ratio matches the specifications.

  • Procedure: Apply a known voltage to the primary winding and measure the output on the secondary, calculating the ratio.

Importance of Transformer Testing

  • Safety: Testing ensures the transformer's insulation, windings, and other components can handle operational stresses, preventing accidents.

  • Reliability: Routine and type tests validate the transformer's performance, reducing the risk of failures and extending its service life.

  • Compliance: Adhering to standards such as IEC 60076 and IS 2026 during testing ensures that transformers meet industry requirements for quality and safety.

Standards for Transformer Testing

  • IEC 60076: Provides guidelines for testing power transformers, including type, routine, and special tests.

  • IS 2026: Indian standard that outlines testing procedures for power transformers in line with IEC standards.

Wrapping Up

Testing transformers is essential for ensuring safe, efficient, and reliable operation. By conducting type, routine, and on-site tests according to international and national standards, engineers can verify that transformers are built and maintained to handle the demands of electrical power systems.